The decent start to May means three Crub foundations and posts have been done and one finished in Stornoway. 6.4M, 9.6 and 12.7M sizes and all with different gable configurations. Plenty more to do and then a trip to start crubs in Dingwall and Aberdeen.
Now, to wait for days for the concrete to harden
Perfectly aligned recycled plastic posts in whole batches of concrete
Nearly there
A difficult site which needed an excavator
Latest Hebcrub finished in Stornoway
Door handle and latch details
Power barrow essential to move materials over a steep site